Brussels Expo Hall 7
Beam
Steel
Center clearance
14.38 meters
Side clearance
13.00 meters
Glass clearance
11.97 meters - left/right hall
Weight/Point
400 kg
Particularities
Working with Cherry Pick up.
Try no points under the central glass.
The maximum hight for the points between the left and right glass are 7.50 meter.
Beam clamp are neccesary for the rigging points.